  1. A master frm online identifies the consequences of each risk, from a brief risk rain session, in which information was gathered about what would happen if the risks materialize. It associates each risk with the consequences they arrived at during that session. It is necessary to be as specific as possible with each one; "The project is late" is not as acceptable as "the project will be delayed 13 days. If there is a dollar value, list it. Simply saying "about the budget" is very general.
×
×